References



Borgo Hermada, Terracina

Peak power: 2.2 MWp
Modules: 180 Wp, SunEarth® Mono
Construction Time: 4 Month (28-12-2009)
Investor: ACEA Spa
Aenergica role: EPC contractor, module supply, installation, technical layout
Developer:
Aenergica Srl

Cosma e Damiano

Peak power: 2.800 kWp
Modules: 275 Wp, SunEarth® Poly
Construction Time: 2010
Investor: ACEA Spa
EPC: Consorzio SAEC
Developer: Aenergica Solar System

Giuliano di Roma

Peak power: 2.500 kWp
Modules: 275 Wp, SunEarth® Poly
Construction Time: 2010
Investor: ACEA Spa
EPC: Consorzio SAEC
Developer: ISA Energia

Commercity

Peak power: 5.000 kWp Car Parking
Modules: 280 Wp, SunEarth® Poly
Construction Time: 2010
Investor: ACEA Spa
EPC: Consorzio SAEC
Developer: Comune di Roma

Prataccione

Peak power: 12.000 kWp
Modules: 250 Wp, SunEarth® Poly
Construction Time: 2011 in progress
Investor: Ecodelm
EPC: Ecosuntek Spa
Developer: Aenergica Solar System

Montalto

Peak power: 997 kWp
Modules: 280 Wp, SunEarth® Poly
Construction Time: 2011
Investor: Photovolt-one
EPC: Consorzio SAEC
Developer: Aenergica Solar System

Pomezia

Peak power: 5.000 kWp
Modules: 275 Wp, SunEarth® Poly
Construction Time: 2010
Investor: ACEA Spa
EPC: Enertronica
Developer: Absolute Solar

Villapiana

Peak power: 14.500 kWp, Greenhouses
Modules: 280 Wp, SunEarth® Poly
Construction Time: 2011
Investor: Holdin Fotovoltaica Spa
EPC: Consorzio SAEC
Developer: Sideredil

CAR

Peak power: 3.500 kWp, Car parking
Modules: 280 Wp, SunEarth® Poly
Construction Time: 2011
Investor: ACEA Spa
EPC: Consorzio SAEC / Enertronica
Developer: Green Utility Spa

Gramiccia

Peak power: 900 kWp
Modules: 275 Wp, SunEarth® Poly
Construction Time: 2011
Investor: Leone spv
EPC: Consorzio SAEC
Developer: Sun Ray

Cannara 1

Peak power: 1000 kWp
Modules: 235 Wp, SunEarth® Poly
Construction Time: 2010
Investor: Perugia Energia
EPC: Perugia Energia
Developer: PR.A.IT Soc.Coop.

Cannara 2

Peak power: 1000 kWp
Modules: 235 Wp, SunEarth® Poly
Construction Time: 2010
Investor: Perugia Energia
EPC: Perugia Energia
Developer: PR.A.IT Soc.Coop.

Pomigliano D’Arco, Napoli

Peak power: 548 kWp
Modules: 180 Wp, SunEarth® Mono
Construction Time: 2 Month (12-2009)
Investor: IRFIS Mediocredito della Sicilia ( Unicredit Group )
MA-FRA: EPC contractor, module supply, installation, technical layout
Developer: MA-FRA